ASSEMBLY | HARNESS | PAINT

 

Allowing manufacturing engineers to write the "manufacturing script" for an assembly process and display that script directly onto the target assembly.

Produce: Display the Script

Plan: Write the Script

Reduced 80 hours on Nacelle Inlet Duct
- Cleco and fastener installation

Reduced 96 hours on Wing Skin Installation
- Template placement, drill guidance, fastener install

Reduced 80 hours on Mid-life Modification
- Install 4-layer doublers over troop door on cargo plane – fastener installation
This disruptive manufacturing technology has saved more than 200 hours per plane and a potential $111 million for the F-35 program alone. Projectionworks will revolutionise how we assemble, maintain and repair our fleets - from jets, to submarines, to ships, to satellites.

U.S. Airforce